Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 1 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China
TEST REPORT
Standard IEC TS 62910:2020 TUV SUD Test Report for Utility-interconnected photovoltaic inverters – Test procedure for Under voltage ride-through measurements
Report No.: 64.290.23.31217.01
Date of issue: 2023-07-18
Project handler: Jinjing Peng Testing laboratory: TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch Address: TÜV SÜD Testing Center, D1 building, No. 63 Chuangqi Road, Shilou Town, Panyu District, Guangzhou 511447, China Testing location: Same as above
Client: Huawei Technologies Co., Ltd.
Client number: 041829
Address: Administration Building Headquarters of Huawei Technologies Co.,
Ltd.Bantian, Longgang District 518129 Shenzhen PEOPLE'S REPUBLIC OF CHINA Contact person: Wu Shao Standard: This TUV SUD test report form is based on the following requirements:
IEC TS 62910:2020
TRF number and revision: TRF IEC TS 62910:2020 rev.2/2020-07
TRF originated by: TUV SUD Product Service, Mr. Billy Qiu Copyright blank test report: This test report is based on the content of the standard (see above). The test report
TRF number and revision: TRF IEC TS 62910:2020 rev.2/2020-07
TRF originated by: TUV SUD Product Service, Mr. Billy Qiu Copyright blank test report: This test report is based on the content of the standard (see above). The test report considered selected clauses of the a.m. standard(s) and experience gained with product testing. It was prepared by TUV SUD Product Service.
TUV SUD Group takes no responsibility for and will not assume liability for damages resulting from the reader’s interpretation of the reproduced material due to its placement and context.
General disclaimer: This test report may only be quoted in full. Any use for advertising purposes must be granted in writing. This report is the result of a single examination of the object in question and is not generally applicable evaluation of the quality of other products in regular production.
Scheme: TUV Mark EU-Directive without certification
GS Mark NRTL Mark Type verification of conformity Non-standard test method: No Yes, see details under Summary of testing National deviations: N/A Number of pages (Report): 27 Number of pages (Attachments): N/A
Compiled by: Jinjing Peng
Approved by: Kennen WangTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 2 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656,
P.R.China Test sample: Solar Inverter Type of test object: Type Test
Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656,
P.R.China Test sample: Solar Inverter Type of test object: Type Test
Trademark:
Model and/or type reference: SUN2000-330KTL-H1, SUN2000-330KTL-H2 Rating(s): See page 4
Manufacturer: Huawei Technologies Co., Ltd.
Manufacturer number: 041829
Address: Administration Building Headquarters of Huawei Technologies Co.,
Ltd.Bantian, Longgang District 518129 Shenzhen PEOPLE'S REPUBLIC OF CHINA Sub-contractors/ tests (clause): N/A
Name: N/A Order description: Complete test according to TRF Partial test according to manufacturer's specifications Preliminary test Spot check Others: Date of order: 2023-07-03
Date of receipt of test item: 2023-07-05
Date(s) of performance of test: 2023-07-06 to 2023-07-15
Test item particulars: Clause Requirement
Cl. 5 Under voltage ride-through Remark: The model SUN2000-330KTL-H1 was selected as representative testing. TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch TÜV SÜD Testing Center, D1 building, No. 63 Chuangqi Road, Shilou Town, Panyu District, Guangzhou 511447, China Summary of testing: deviation(s) found no deviations found If additional information is necessary, please provide The testing was performed as to manufacturer’s specification for under voltage ride-through (UVRT) requirement of standard “Central Electricity Authority (Technical Standards for Connectivity to the Grid)
Summary of testing: deviation(s) found no deviations found If additional information is necessary, please provide The testing was performed as to manufacturer’s specification for under voltage ride-through (UVRT) requirement of standard “Central Electricity Authority (Technical Standards for Connectivity to the Grid)
(Amendment) Regulations, 2019”. The detail of this specification is duplicated on page 13;Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 3 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China
General product information:
1. The inverter is non-isolated PV inverter for connection with public medium or high voltage grid, for outdoor or indoor use.
2. The adjustable power factor range of SUN2000-330KTL-H1 and SUN2000-330KTL-H2 is 0.8 inductive(under-excited) to 0.8 capacitive(over-excited).
3. LVRT logic is as follow: Determination of entering LVRT mode: Any phase voltage is lower than 0.9Un, the inverter will enter LVRT mode.
LVRT mode behavior: During LVRT fault, positive and negative sequence of reactive current is determined by k-factor. K-factor of positive sequence is 2 and K-factor of negative sequence is 0. The injection of reactive current is first priority. The supply of active has the second priority and the active power preferably be maintained during voltage drop, unless the rated apparent current is reached. Under unbalance voltage
by k-factor. K-factor of positive sequence is 2 and K-factor of negative sequence is 0. The injection of reactive current is first priority. The supply of active has the second priority and the active power preferably be maintained during voltage drop, unless the rated apparent current is reached. Under unbalance voltage fault, the maximum injection of reactive current is limited to 0.4In.
4. The inverter is designed for fixed mounted on the wall.
5. The firmware version : V500R023. The software version : V500R023C00
Model differences: SUN2000-330KTL-H1 and SUN2000-330KTL-H2 have same electric circuits topology design, same enclosure structure design, same main control circuits and firmware. The output power and current are limited by software.Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 4 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China
Ratings:
Model: SUN2000-330KTL-H1 SUN2000-330KTL-H2
PV input parameter Maximum input voltage 1500 Vd.c. MPPT voltage range 500~1500 Vd.c. Maximum input current 665 Ad.c.
PV ISC 6115 Ad.c.
Grid parameter Rated output voltage 800 Va.c., 3W~ +PE Rated output frequency 50 Hz
MPPT voltage range 500~1500 Vd.c. Maximum input current 665 Ad.c.
PV ISC 6115 Ad.c.
Grid parameter Rated output voltage 800 Va.c., 3W~ +PE Rated output frequency 50 Hz Rated output current 216.5 Aa.c. 198.4 Aa.c. Maximum continuous output current 238.2 Aa.c. 238.2 Aa.c. Rated output active power 300000 W 275000 W Maximum continuous output power 330000 W 330000 W Maximum continuous output apparent power 330000 VA 330000 VA Power factor 0.8 inductive(under-excited) to 0.8 capacitive(over-excited)
Attachments: N/A General remarks: "(see remark #)" refers to a remark appended to the report. "(see appended table)" refers to a table appended to the report.
Throughout this report a point is used as the decimal separator. The test results presented in this report relate only to the object tested. This report shall not be reproduced except in full without the written approval of the testing laboratory.Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 5 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Copy of marking plate:Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Copy of marking plate:Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 6 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China
Picture of the product:
Front view
Bottom view
Left side view
Right side view
AC side terminal block
DC side terminal blockClause Requirement + Test result − Remark Verdict
Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 7 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China 4 Test circuit and equipment 4.1 General Three phase short-circuit fault and Two-phase short-circuit fault and one-phase short-circuit with ground was tested for UVRT. P
P.R.China 4 Test circuit and equipment 4.1 General Three phase short-circuit fault and Two-phase short-circuit fault and one-phase short-circuit with ground was tested for UVRT. P 4.2 Test circuit P 4.3 Test equipment P 4.3.1 Measuring instruments P 4.3.2 DC source The PV array simulator is used P 4.3.3 Short-circuit emulator The short-circuit emulator is used P 4.3.4 Converter based grid simulator N/A 5 Test 5.1 Test protocol P The UVRT test protocol is designed to verify that the EUT responds appropriately to voltage drops (due to grid faults). During the test, the EUT shall demonstrate that it can: P - Appropriately detect the simulated fault. P - Ride through the event and continue operation as specified in the applicable curves. P - Not suffer any damage from the event. P The response to the voltage drop specified in Table 3 shall be recorded over the EUT operating period with two output power ranges: P a) between 0,1 Pn and 0,3 Pn; The 0.2 Pn was tested P b) above 0,9 Pn; P and with two fault conditions: P c) three-phase drop; P d) two-phase drop or single-phase drop. Two-phase with ground P The tests should be carried out at least twice at each test point listed in Table 3. N/A 5.2 Test curve P The UVRT response characteristic shall meet the requirements of the UVRT curve specified by different countries and regions as needed(see also Annex C). Meet the requirement of UVRT curve of india CEA P 5.3 Test procedure P
5.2 Test curve P The UVRT response characteristic shall meet the requirements of the UVRT curve specified by different countries and regions as needed(see also Annex C). Meet the requirement of UVRT curve of india CEA P 5.3 Test procedure P 5.3.1 Pre-test PClause Requirement + Test result − Remark Verdict
Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 8 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Prior to the fault simulation tests, the EUT should run in normal operating mode. The selected UVRT curve should be used to identify voltage drop points, including the lowest point and the inflection point, as well as other random points in the curve. Selection of the drop time should follow the requirement of the applicable country or region. P 5.3.2 No-load test P Prior to the load test, adjust the fault emulator to simulate symmetrical and asymmetrical voltage drops without EUT connection, and validate that the measured results are as intended. This step ensures that the amplitude of voltage and drop duration can match the requirements in Figure 5. P 5.3.3 Tolerance P The tolerances for drop depth and duration during the no-load test shall reference the requirement of Figure 6 in IEC 61400that the amplitude of voltage and drop duration can match the requirements in Figure 5. P 5.3.3 Tolerance P The tolerances for drop depth and duration during the no-load test shall reference the requirement of Figure 6 in IEC 6140021:2008, and not exceed the values shown in Figure 5. P The tolerance for voltage magnitude is ± 5 % of rated voltage for the period before and during the voltage drop. The tolerance for voltage magnitude is ± 10 % of rated voltage during the period after voltage is recovered. The tolerances shall be measured between 0 and +5 % of rated voltage for the lowest point and the inflection point under no-load conditions. P The duration of each voltage drop is determined according to the requirements of the applicable UVRT curve. The tolerance range for both drop duration and rise time prefers 40 ms. P 5.3.4 Load test P Tests under load shall be carried out after the no-load test results successfully meet the performance requirements. The parameters of the grid fault simulator should be consistent with the no-load test. P With the EUT connected to the grid fault simulator device and the PV simulator(or PV array), the output power should be set to (0,1~0,3)Pn and above 0,9Pn separately. Additional load tests at other power levels The output power is set to 0.2 Pn and 1.0 Pn PClause Requirement + Test result − Remark Verdict
Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 9 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 9 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China should be performed as determined by the specific country or regional requirements. During the UVRT test, MP1, MP2, and MP3 (shown in Figure 1) shall be selected as the test points for measuring and recording the values of voltage and current. MP3 was selected as the test point P The waveform and data of the measured voltage and current at the measuring points shall be recorded by the data acquisition device from time A prior to the voltage drop to time B after the subsequent voltage rise. For “A” and “B”, specific data should be determined by different countries or regions. See appended table P 6 Assessment criteria The various assessment criteria is determined by the requirements of the different countries or regions. The characteristics and performance criteria for utilization are shown in Annex B, and can be referenced by a local user. P Annex A Circuit faults and voltage drops (informative)
A.1 Fault types P A.2 Voltage drops P Annex B Determination of critical performance values in UVRT testing (informative)
B.1 General Meet the requirement of india CEA P B.2 Drop depth ratio Meet the requirement of india CEA P B.3 Ride-through time Meet the requirement of india CEA P
Annex B Determination of critical performance values in UVRT testing (informative)
B.1 General Meet the requirement of india CEA P B.2 Drop depth ratio Meet the requirement of india CEA P B.3 Ride-through time Meet the requirement of india CEA P B.4 Reactive current Meet the requirement of india CEA P B.5 Active power Meet the requirement of india CEA P Annex C Requirements of the UVRT curve (informative)
C.1 General Meet the requirement of india CEA P C.2 UVRT curve Meet the requirement of india CEA P C.3 Test points Meet the requirement of india CEA PTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 10 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Specification of national requirement Name of the standard or grid code with clause reference: Central Electricity Authority (Technical Standards for Connectivity to the Grid) (Amendment) Regulations, 2019. The generating station connected to the grid, shall remain connected to the grid when voltage at the interconnection point on any or all phases dips up to the level depicted by the thick lines in the following curve:
UVRT curve:
Reactive current, active power and recover time requirement: Provided that during the voltage dip, the supply of reactive power has first priority, while the supply of active power has second priority and the active power preferably be maintained during voltage drops,
curve:
UVRT curve:
Reactive current, active power and recover time requirement: Provided that during the voltage dip, the supply of reactive power has first priority, while the supply of active power has second priority and the active power preferably be maintained during voltage drops, provided, a reduction in active power within the plant’s design specifications is acceptable and active power be restored to at least 90% of the pre-fault level within 1 sec of restoration of voltage. A typical ∆/Y transformer is assumed between PCC and PV inverter. According to the standard IEC TS 62910 table A.4 & A.5, the voltage amplitude and phase changes are shown below: Residual voltage of fault phase [p. u.] Two-phase short-circuit fault with ground Phase A Phase B Phase C Am. Ph. Am. Ph. Am. Ph. 0.15 1 0 0.5166 165.436 0.5166 194.564 0.25 1 0 0.5449 156.587 0.5449 203.413 0.50 1 0 0.6614 139.107 0.6614 220.893 0.80 1 0 0.8544 125.818 0.8544 234.183 0.85 1 0 0.8899 124.186 0.8899 235.814 0.87 1 0 0.9043 123.569 0.9043 236.431 0.90 1 0 0.9260 122.680 0.9260 237.320 1 1 0 1 120 1 240Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 11 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 11 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China
Summary of test condition for UVRT Group Phase fault EUT output conditions Dip depth[p.u.] Fault duration [ms] Active power Reactive Power Test No. Recover time limit Set value Requirement Requirement 1 Threephase Full load (100%Pn) <0.15Un 350ms Pn Maximum 1.1.1 (a) 1s Partial load (20%Pn) 20%Pn Maximum 1.1.2 (a) Twophase Full load (100%Pn) <0.15Un 350ms Pn Maximum 1.2.1 (a) Partial load (20%Pn) 20%Pn Maximum 1.2.2 (a) 2 Threephase Full load (100%Pn) 0.450.5Un 1650ms Pn Maximum 2.1.1 (a) 1s Partial load (20%Pn) 20%Pn Maximum 2.1.2 (a) Twophase Full load (100%Pn) 0.450.5Un 1650ms
(a) 1s Partial load (20%Pn) 20%Pn Maximum 2.1.2 (a) Twophase Full load (100%Pn) 0.450.5Un 1650ms Pn Maximum 2.2.1 (a) Partial load (20%Pn) 20%Pn Maximum 2.2.2 (a) 3 Threephase Full load (100%Pn) 0.80Un0.85Un 3500ms Pn Maximum 3.1.1 (a) 1s Partial load (20%Pn) 20%Pn Maximum 3.1.2 (a) Twophase Full load (100%Pn) 0.80Un0.85Un 3500ms Pn Maximum 3.2.1 (a) Partial load (20%Pn) 20%Pn Maximum 3.2.2 (a) 4 Threephase Full load (100%Pn) 0.90Un 11000ms Pn Maximum 4.1.1 (a) 1s Partial load (20%Pn) 20%Pn Maximum 4.1.2 (a) Twophase Full load (100%Pn) 0.90Un 11000ms Pn Maximum 4.2.1 (a) Partial load (20%Pn) 20%Pn Maximum 4.2.2 (a)Test Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 12 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 12 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 1.1.1 (a) Requirement Phase fault Three-phase Power load Full load (100%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.1 Un Set fault duration [ms] 350 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 303291.30 800.48 800.56 800.50 Output current (A) 218.64 219.44 218.44 Output reactive power (var) 4778.54 During fault Fault Duration (ms) 359.52ms Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W) 303.22 86.20 85.74 86.28 Output current (A) 214.97 216.05 214.62 Output reactive power (var) 31840.90 Output active current (A) -0.36 Output reactive current (A) 217.25 After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 296100.20 800.49 800.55 800.46
After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 296100.20 800.49 800.55 800.46 Output current (A) 213.43 214.40 213.10 Output reactive power (var) 8043.68 Recover time (ms) 814.4 Mean output active power in 5s (W) 60112.98 Graphic during testingTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 13 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 1.1.2 (a) Requirement Phase fault Three-phase Power load Partial load (20%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.1 Un Set fault duration [ms] 350 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 59958.66 799.47 799.72 799.50 Output current (A) 43.53 43.46 43.31 Output reactive power (var) 4757.83 During fault Fault Duration (ms) 352.41 Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 604.87 84.79 85.26 84.95
During fault Fault Duration (ms) 352.41 Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 604.87 84.79 85.26 84.95 Output current (A) 216.28 217.73 216.44 Output reactive power (var) 31901.22 Output active current (A) 3.70 Output reactive current (A) 217.15 After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 59965.45 799.50 799.72 799.50 Output current (A) 43.70 43.69 43.54 Output reactive power (var) 7535.92 Recover time (ms) 15.4 Mean output active power in 5s (W) 60112.98 Graphic during testingTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 14 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 1.2.1 (a) Requirement Phase fault Two-phase Power load Full load (100%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.1 Un Set fault duration [ms] 350 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
(100%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.1 Un Set fault duration [ms] 350 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 303261.30 800.49 800.53 800.46 Output current (A) 218.61 219.42 218.22 Output reactive power (var) 4738.67 During fault Fault Duration (ms) 352.20 Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 145092.20 409.76 410.89 799.13 Output current (A) 204.45 211.05 211.09 Output reactive power (var) 101812.30 Output active current (A) 187.96 Output reactive current (A) 88.97 After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 302954.80 800.49 800.54 800.46 Output current (A) 218.43 219.49 218.03 Output reactive power (var) 8588.25 Recover time (ms) 17.0 Mean output active power in 5s (W) 303347.30 Graphic during testingTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 15 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 1.2.2 (a) Requirement Phase fault Two-phase Power load Patial load (20%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.1 Un Set fault duration [ms] 350 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 60078.54 799.44 799.72 799.49 Output current (A) 43.73 43.69 43.53 Output reactive power (var) 6737.83 During fault Fault Duration (ms) 359.98 Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 42573.08 413.04 407.07 798.20 Output current (A) 102.80 107.52 105.70 Output reactive power (var) 77582.14 Output active current (A) 56.93 Output reactive current (A) 86.45 After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 59979.45 799.47 799.70 799.48 Output current (A) 43.57 43.59 43.35 Output reactive power (var) 5614.52 Recover time (ms) 18.5 Mean output active power in 5s (W) 60161.13
799.47 799.70 799.48 Output current (A) 43.57 43.59 43.35 Output reactive power (var) 5614.52 Recover time (ms) 18.5 Mean output active power in 5s (W) 60161.13 Graphic during testingTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 16 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 2.1.1 (a) Requirement Phase fault Three-phase Power load Full load (100%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.45 Un Set fault duration [ms] 1650 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 303255.40 800.50 800.55 800.49 Output current (A) 218.60 219.43 218.19 Output reactive power (var) 4872.01 During fault Fault Duration (ms) 1654.38 Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 12932.71 364.86 365.13 364.86 Output current (A) 219.32 220.17 218.84 Output reactive power (var) 137978.80
L1-L2 L2-L3 L3-L1
Output active power (W) 12932.71 364.86 365.13 364.86 Output current (A) 219.32 220.17 218.84 Output reactive power (var) 137978.80 Output active current (A) 20.36 Output reactive current (A) 217.58 After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 303157.10 800.49 800.56 809.49 Output current (A) 218.51 219.52 218.15 Output reactive power (var) 8076.91 Recover time (ms) 890.5 Mean output active power in 5s (W) 281971.80 Graphic during testingTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 17 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 2.1.2 (a) Requirement Phase fault Three-phase Power load Partial load (20%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.45 Un Set fault duration [ms] 1650 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 59978.93
Dip depth[p.u.] -set value 0.45 Un Set fault duration [ms] 1650 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 59978.93 799.45 799.73 799.52 Output current (A) 43.65 43.62 43.46 Output reactive power (var) 6652.28 During fault Fault Duration (ms) 1650.45 Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 12618.82 364.73 365.10 364.71 Output current (A) 219.24 220.09 218.74 Output reactive power (var) 138044.90 Output active current (A) 19.95 Output reactive current (A) 217.89 After occurs Output voltage (V) L1-L2 L2-L3 L3-L1 Output active power (W, after 1s) 59921.19 799.48 799.71 799.49 Output current (A) 43.65 43.63 43.50 Output reactive power (var) 7268.14 Recover time (ms) 14.9 Mean output active power in 5s (W) 59986.71 Graphic during testingTest Report IEC TS 62910:2020
Project No: 64.290.23.31217.01
Rev.: 00
Date: 2023-07-18
Page: 18 of 27
Telephone : +86 20 38320668
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd,
Telefax : +86 20 38320478
http://www.tuv -sud.cn TÜV SÜD Certification and Testing (China) Co., Ltd. Guangzhou Branch, TÜV SÜD Group 5F, Communication Building, 163 Pingyun Rd, Huangpu Ave. West,Guangzhou, 510656, P.R.China Test Number 2.2.1 (a) Requirement Phase fault Two-phase Power load Full load (100%Pn) AC Frequency 50Hz Dip depth[p.u.] -set value 0.45 Un Set fault duration [ms] 1650 Before fault occurs Output voltage (V)
L1-L2 L2-L3 L3-L1
Output active power (W) 303335.00 800.47 800.49 800.44 Output current (A) 218.65 219.51 218.26 Output reactive power (var) 4850.37 During fault Fa