Prü fbericht - Produkte Test Report - Products Prü fbericht-Nr.:
Test report no.:
CN24LC9U 001 Auftrags-Nr.:
Order no.:
326044632 Seite 1 von 10 Page 1 of 10
Kunden-Referenz-Nr.: Client reference no.:
2003666 Auftragsdatum:
Order date:
2024-08-07
Auftraggeber: Client:
Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd.,New & High,Technology Industrial,Development Zone, Hefei, 230088 Anhui, P.R. China Prü fgegenstand:
Test item:
PV-Inverter(Grid-connected PV Inverter) Bezeichnung / Typ-Nr.: Identification / Type no.:
SG1100UD, SG1100UD-20
Auftrags-Inhalt: Order content:
AK certificate Prü fgrundlage:
Test specification:
Creg 060:2019
Wareneingangsdatum: Date of sample receipt:
2024-09-25
Prü fmuster-Nr.:
Test sample no:
A003876740-001 Prü fzeitraum:
Testing period:
2024-09-30 - 2024-11-20 Ort der Prü fung:
Place of testing:
Sungrow Power Supply Co.,Ltd. Prü flaboratorium:
Testing laboratory:
TÜV Rheinland (Shanghai) Co., Ltd. Prü fergebnis:
Test result: Pass geprü ft von: tested by: Theo Tang X
genehmigt von: authorized by:Chu Sun X
Datum:
TÜV Rheinland (Shanghai) Co., Ltd. Prü fergebnis:
Test result: Pass geprü ft von: tested by: Theo Tang X
genehmigt von: authorized by:Chu Sun X
Datum: Date: 2024-11-28
Ausstellungsdatum: Issue date: 2024-11-28
Stellung / Position: Engineer Stellung / Position: Authorizer Sonstiges /
Other:
Zustand des Prü fgegenstandes bei Anlieferung: Condition of the test item at delivery: Prü fmuster vollstä ndig und unbeschä digt Test item complete and undamaged Legende: P(ass) = entspricht o.g. Prü fgrundlage(n) F(ail) = entspricht nicht o.g. Prü fgrundlage(n) N/A = nicht anwendbar N/T = nicht getestet Legend: P(ass) = passed a.m. test specification(s) F(ail) = failed a.m. test specification(s) N/A = not applicable N/T = not tested Dieser Prü fbericht bezieht sich nur auf das o.g. Prü fmuster und darf ohne Genehmigung der Prü fstelle nicht auszugsweise vervielfä ltigt werden. Dieser Bericht berechtigt nicht zur Verwendung eines Prü fzeichens. This test report only relates to the above mentioned test sample. Without permission of the test center this test report is not permitted to be duplicated in extracts. This test report does not entitle to carry any test mark. TUV Rheinland (Shanghai) Co., Ltd. No.177, 178, Lane 777 West Guangzhong Road, Jing'an District,Shanghai, China Mail: service-gc@tuv.com · Web: www.tuv.com V101023GCNSRPrü fbericht - Produkte Test Report - Products
Mail: service-gc@tuv.com · Web: www.tuv.com V101023GCNSRPrü fbericht - Produkte
Test Report - Products Prüfbericht-Nr.: CN24LC9U 001
Test report no.: Seite 2 von 10
Page 2 of 10 Anmerkungen Remarks
1 Alle eingesetzten Prü fmittel waren zum angegebenen Prü fzeitraum gemä ß eines festgelegten Kalibrierungsprogramms unseres Prü fhauses kalibriert. Sie entsprechen den in den Prü fprogrammen hinterlegten Anforderungen. Die Rü ckverfolgbarkeit der eingesetzten Prü fmittel ist durch die Einhaltung der Regelungen unseres Managementsystems gegeben. Detaillierte Informationen bezü glich Prü fkonditionen, Prü fequipment und Messunsicherheiten sind im Prü flabor vorhanden und kö nnen auf Wunsch bereitgestellt werden.
The equipment used during the specified testing period was calibrated according to our test laboratory calibration program. The equipment fulfils the requirements included in the relevant standards. The traceability of the test equipment used is ensured by compliance with the regulations of our management system. Detailed information regarding test conditions, equipment and measurement uncertainty is available in the test laboratory and could be provided on request. 2 Wie vertraglich vereinbart, wurde dieses Dokument nur digital unterzeichnet. Der TÜV Rheinland hat nicht ü berprü ft, welche rechtlichen oder sonstigen diesbezü glichen Anforderungen fü r dieses Dokument gelten. Diese Überprü fung liegt in der Verantwortung des Benutzers dieses Dokuments. Auf Verlangen des Kunden kann der TÜV Rheinland die Gü ltigkeit der digitalen Signatur durch ein gesondertes Dokument bestä tigen. Diese Anfrage ist an unseren Vertrieb zu richten. Eine Umweltgebü hr fü r einen solchen zusä tzlichen Service
kann der TÜV Rheinland die Gü ltigkeit der digitalen Signatur durch ein gesondertes Dokument bestä tigen. Diese Anfrage ist an unseren Vertrieb zu richten. Eine Umweltgebü hr fü r einen solchen zusä tzlichen Service wird erhoben. Informationen zur Verifizierung der Authentizitä t unserer Dokumente erhalten Sie auf folgender Webseite: go.tuv.com/digital-signature
As contractually agreed, this document has been signed digitally only. TUV Rheinland has not verified and unable to verify which legal or other pertaining requirements are applicable for this document. Such verification is within the responsibility of the user of this document. Upon request by its client, TUV Rheinland can confirm the validity of the digital signature by a separate document. Such request shall be addressed to our Sales department. An environmental fee for such additional service will be charged. For information on verifying the authenticity of our documents, please visit the following website: go.tuv.com/digital -signature 3 Prü fklausel mit der Note wurden an qualifizierte Unterauftragnehmer vergeben und sind unter der jeweiligen Prü fklausel des Berichts beschrieben. Abweichungen von Prü fspezifikation(en) oder Kundenanforderungen sind in der jeweiligen Prü fklausel im Bericht aufgefü hrt.
Test clauses with remark of are subcontracted to qualified subcontractors and descripted under the respective test clause in the report. Deviations of testing specification(s) or customer requirements are listed in specific test clause in the report. 4 Die Entscheidungsregel fü r Konformitä tserklä rungen basierend auf numerischen Messergebnisen in diesem Prü fbericht basiert auf der "Null-Grenzwert-Regel" und der "Einfachen Akzeptanz" gemä ß ILAC G8:2019 und
IEC Guide 115:2021, es sei denn, in der auf Seite 1 dieses Berichts genannten angewandten Norm ist etwas anderes festgelegt oder vom Kunden gewü nscht. Dies bedeutet, dass die Messunsicherheit nicht berü cksichtigt wird und daher auch nicht im Prü fbericht angegeben wird. Zu weiteren Informationen bezueglich des Risikos durch diese Entscheidungsregel siehe ILAC G8:2019.
The decision rule for statements of conformity, based on numerical measurement results, in this test report is based on the “Zero Guard Band Rule” and “Simple Acceptance” in accordance with ILAC G8:2019 and IEC Guide 115:2021, unless otherwise specified in the applied standard mentioned on Page 1 of this report or requested by the customer. This means that measurement uncertainty is not taken in account and hence also not declared in the test report. For additional information to the resulting risk based of this decision rule please refer to ILAC G8:2019.www.tuv.com
TEST REPORT COMISIÓN DE REGULACIÓN DE ENERGÍ A Y GAS Resolució n No. 060 DE 2019
Report Reference No. ...................... : CN24LC9U 001 Tested by (name + signature) .......... : See cover page ...................................................... Witnessed by (name + signature) .... : See cover page ...................................................... Supervised by (name + signature) ... : See cover page ...................................................... Approved by (name + signature) ...... : See cover page ...................................................... Date of issue ..................................... : See cover page Testing Laboratory ........................... : TÜV Rheinland (Shanghai) Co., Ltd. Address ............................................ : No.177, 178, Lane 777 West Guangzhong Road, Jing'an District,Shanghai, China Testing location/ address ................. : Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd.,New & High,Technology Industrial,
Address ............................................ : No.177, 178, Lane 777 West Guangzhong Road, Jing'an District,Shanghai, China Testing location/ address ................. : Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd.,New & High,Technology Industrial, Development Zone,Hefei, 230088 Anhui, P.R. China Applicant’s name .............................. : Sungrow Power Supply Co., Ltd. Address ............................................ : No.1699 Xiyou Rd.,New & High,Technology Industrial, Development Zone,Hefei, 230088 Anhui, P.R. China Test specification: Standard ........................................... : Creg 060:2019 Test procedure ................................. : AK Non-standard test method………..: N/A Test Report Form No. ....................... : TRF_ Creg 060:2019 Test Report Form(s) Originator ........ : TÜV Rheinland Group Master TRF ....................................... : 2024-02 Copyright © 2006 IEC System for Conformity Testing and Certification of Electrical Equipment (IECEE), Geneva, Switzerland. All rights reserved. This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. Test item description ........................ : PV-Inverter(Grid-connected PV Inverter) Trade Mark ....................................... :
Manufacturer .................................... : Same as applicant. Model/Type reference ...................... : SG1100UD, SG1100UD-20 Ratings ............................................. : See model list and marking label on following pages.www.tuv.com
Page 4 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
Testing procedure and testing location:
Testing Laboratory:
Page 4 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
Testing procedure and testing location:
Testing Laboratory: TÜ V Rheinland (Shanghai) Co., Ltd.
No. 177, 178, Lane 777 West Guangzhong Road. Jing’an District. Shanghai. 200072 P.R.China
Testing location/ address ......................... :
Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd.,New & High,Technology Industrial, Development Zone,Hefei, 230088 Anhui, P.R. China Associated Laboratory: Testing location/ address ......................... : Tested by (name + signature) ....... :
Approved by (+ signature) ............. : Testing procedure: TMP Testing location/ address ......................... : Sungrow Power Supply Co., Ltd. No.1699 Xiyou Rd.,New & High,Technology Industrial, Development Zone,Hefei, 230088 Anhui, P.R. China Tested by (name + signature) ....... : See cover page Approved by (+ signature) ............. : See cover page Testing procedure: WMT Testing location/ address ......................... :
Tested by (name + signature) ....... : Witnessed by (+ signature) ............ : Approved by (+ signature) ............. : Testing procedure: SMT Testing location/ address ......................... :
Tested by (name + signature) ....... : Approved by (+ signature) ............. : Supervised by (+ signature) .......... : Testing procedure: RMT Testing location/ address ......................... :
Tested by (name + signature) ....... : Approved by (+ signature) ............. : Supervised by (+ signature) .......... :www.tuv.com
Page 5 of 10
Report No.: CN24LC9U 001
Tested by (name + signature) ....... : Approved by (+ signature) ............. : Supervised by (+ signature) .......... :www.tuv.com
Page 5 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
Equipment mobility .................................................... : movable hand-held stationary fixed Connection to the mains ........................................... : pluggable equipment direct plug-in permanent connection for building-in Operating condition ................................................... : continuous short-time intermittent Over voltage category .............................................. : OVC I OVC II (DC) OVC III (AC) OVC IV Mains supply tolerance (%) ....................................... : According to specified supply range Tested for IT power systems .................................... : Yes No IT testing, phase-phase voltage (V) ......................... : N/A Class of equipment .................................................. : Class I Class II Class III Not classified Mass of equipment (kg)............................................. : See model list Pollution degree ....................................................... : PD 1 PD 2 PD 3 IP protection class .................................................... : IP65
Possible test case verdicts: - test case does not apply to the test object ................. : N/A - test object does meet the requirement ....................... : Pass (P) - test object does not meet the requirement ................. : Fail (F) Testing: Date of receipt of test items .......................................... : See cover page Date(s) of performance of tests .................................... : See cover page General remarks: "(see Attachment #)" refers to additional information appended to the report. "(see appended table)" refers to a table appended to the report.
The tests results presented in this report relate only to the object tested. This report shall not be reproduced except in full without the written approval of the testing laboratory. List of test equipment must be kept on file and available for review.
"(see appended table)" refers to a table appended to the report. The tests results presented in this report relate only to the object tested. This report shall not be reproduced except in full without the written approval of the testing laboratory. List of test equipment must be kept on file and available for review. Additional test data and/or information provided in the attachments to this report. Throughout this report a comma / point is used as the decimal separator. Determination of the test results includes consideration of measurement uncertainty from the test equipment and methods. Manufacturer’s Declaration per sub-clause 6.2.5 of IECEE 02: The application for obtaining a CB Test Certificate includes more than one factory location and a declaration from the Manufacturer stating that the sample(s) submitted for evaluation is (are) representative of the products from each factory has been provided : Yes Not applicablewww.tuv.com
Page 6 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
List of Attachments CN24LC9U 001 Attachment 1-for test data -200 pages CN24LC9U 001 Attachment 2-for photo documention-4 pages
General product information: Breif description:
The PCE under test is three-phase grid connected inverters for solar power generation. The Gridconnected PV Inverter utilize the advanced power conversion technology IGBT to convert the DC power normally from the photovoltaic array to stable three-phase AC power and then feed the power to the utility grid.
Diagram
Model Difference: All models are identical in hardware and software except difference below:
1. Rated Output Voltage and MPP Voltage Range, see the model list for details;
2. Maximum operating temperature at full load, 45℃ for SG1100UD, 51℃ for SG1100UD-20,
Unless otherwise specified, all tests were conducted on basic model of SG1100UD to represent
1. Rated Output Voltage and MPP Voltage Range, see the model list for details;
2. Maximum operating temperature at full load, 45℃ for SG1100UD, 51℃ for SG1100UD-20,
Unless otherwise specified, all tests were conducted on basic model of SG1100UD to represent another model.
Software version: DSP_OPAL-C_V1_A
Serial number: A2400200050
Test condition: Temperature: 25°C Relative humidity: 65%www.tuv.com
Page 7 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
Copy of marking plate: "The artwork below may be only a draft. The use of certification marks on a product must be authorized by the respective NCB' s that own these marks"www.tuv.com
Page 8 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
Model list:
MODELS LIST SG1100UD SG1100UD-20
INPUT VMAX PV [Vdc] 1500
ISC PV [A] 3528
MPP Voltage Range VMPP[Vdc] 895-1500 938-1500 Max. Input Current Imax [A] 1435 Start PV Voltage [Vdc] 905 950 Backfeed Current [A] 0 Overvoltage Category (OVC) II OUTPUT Rated Output Voltage Ur [Vac] 3~ 630 3~ 660 Rated Output Frequency FNETZ [Hz] 50/60 Normal Operating Frequency Range Fn [Hz] 45-55 Hz / 55-65 Hz Rated Output Power PE [kW] 1100 @ 45 ℃ 1100 @ 51 ℃
Rated Output Frequency FNETZ [Hz] 50/60 Normal Operating Frequency Range Fn [Hz] 45-55 Hz / 55-65 Hz Rated Output Power PE [kW] 1100 @ 45 ℃ 1100 @ 51 ℃ Max. Output Power PEmax [kVA] 1265 @ 22.5 ℃ 1320 @ 23 ℃ Max. Output Current Imax [A] 1160 1155 Power Factor cosφ [λ] [-0.8, 0.8] Overvoltage Category (OVC) III
SYSTEM
Protective Class I Enclosure Protection (IP) IP65 Operating Temperature Range [º C] -35 to 60(>45℃ derating) -35 to 60(>51℃ derating) Pollution degree (PD) PD 3 Altitude [m] 4000 Weight [kg] 800 Dimensions [mm] 700mm× 2290mm×1525mm Firmware version DSP_OPAL-C_V1_Awww.tuv.com
Page 9 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
Summary of testing Tests performed (name of test and test clause): Testing location:
Clause Test items 1 Normal operating range (Operation range) 2 Immunity to disturbances - Rate of change of frequency (ROCOF) 3 Frequency Sensitive Mode 4 Over-frequency and under-frequency active power control on the grid connection port 5 Active power reduction through setting provision (P control) 6 P&Q range 7 Undervoltage and overvoltage trip settings test 8 Underfrequency and overfrequency trip settings test 9 Reactive Power Limitation / Remote Command 10 Islanding protection
11 FVRT
The laboratory described on page 4.www.tuv.com
7 Undervoltage and overvoltage trip settings test 8 Underfrequency and overfrequency trip settings test 9 Reactive Power Limitation / Remote Command 10 Islanding protection
11 FVRT
The laboratory described on page 4.www.tuv.com
Page 10 of 10
Report No.: CN24LC9U 001
TRF_ Creg 060:2019 TRF originator: TÜV Rheinland Group
List of used test equipment No. Equipment Internal No. Type/ characteristics Manufacturer Last Calibration Due Data 1 DC Simulator JSCU1203474 IS-10DD-A SUNGROW / / 2 AC Simulator RSVG-357821-028 RSVG-3-10-TAOY Rongxin / / 3 Power quality analyser C5220781CHN TRIO Net DEWETRON 17.10.2023 16.10.2024 4 Power analyser 91V220945 WT3000E YOKOGAWA 30.05.2024 29.05.2025 5 Oscilloscope C022731 MD3014 Tektronix 29.02.2024
28.02.2025
6 High Voltage Probes D166000724 DP6150 CYBERTEK 01.02.2024 31.01.2025 7 Current sensor CT20140801 LT2005-S LEM 13.08.2024 12.08.2025 8 Current sensor CT20140802 LT2005-S LEM 13.08.2024 12.08.2025 9 Current sensor CT20140804 LT2005-S LEM 13.08.2024 12.08.2025 10 Current sensor CT20140805 LT2005-S LEM 13.08.2024 12.08.2025 11 Date collector MY57001528/
9 Current sensor CT20140804 LT2005-S LEM 13.08.2024 12.08.2025 10 Current sensor CT20140805 LT2005-S LEM 13.08.2024 12.08.2025 11 Date collector MY57001528/ MY41238614 34972A/34901A KEYSIGHT 04.07.2024 03.07.2025 12 Temperature Chamber RLB1904006 RL050M-D35H85T-01 Ruilan 21.11.2023 20.11.2024 13 Impuse voltage test 0140901 LSG-2551T Linshi 14.12.2023 13.12.2024 14 Electrical Safety Tester 1716355 SE7440 Huayi 04.02.2024 03.02.2025 15 Tensiometer 11311026147 54 HP-1K / 18.07.2024 17.07.2025 16 Caliper S160702025 (0-150)mm SATA 05.01.2024 04.01.2025
-End of test report-Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 1 von 200 Page 1 of 200
Test plan for Columbia
Project Engineer: Theo Tang Reviewer: Chu Sun
Signature: Signature:
Testing Laboratory: Name: TÜV Rheinland (Shanghai) Co., Ltd.
Address: No. 177, 178, Lane 777 West Guangzhong Road. Jing’an
District. Shanghai. 200072 P.R.China
Testing Location: Name: Sungrow Power Supply Co., Ltd.
Address: No.1699 Xiyou Rd.,New & High,Technology Industrial,
Development Zone,Hefei, 230088 Anhui, P.R. China
Test Sample No.: A003876740-001
Test Condition: Generator reference system applied in test:
Address: No.1699 Xiyou Rd.,New & High,Technology Industrial,
Development Zone,Hefei, 230088 Anhui, P.R. China
Test Sample No.: A003876740-001
Test Condition: Generator reference system applied in test:
Test Date: 2024-09-30 - 2024-11-20
Test bench diagram:
A network model (grid impedance simulator) only connected in test bench in flicker and harmonic test, in the other tests the network model is bypassed.Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 2 von 200 Page 2 of 200
Test plan for Columbia Clause Test items Remark 1 Normal operating range (Operation range) Pass 2 Immunity to disturbances - Rate of change of frequency (ROCOF) Pass 3 Frequency Sensitive Mode Pass 4 Over-frequency and under-frequency active power control on the grid connection port Pass 5 Active power reduction through setting provision (P control) Pass 6 P&Q range Pass 7 Undervoltage and overvoltage trip settings test Pass 8 Underfrequency and overfrequency trip settings test Pass 9 Reactive Power Limitation / Remote Command Pass 10 Islanding protection Pass 11 FVRT PassTest Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 3 von 200 Page 3 of 200
Test plan for Columbia 1 TABLE: Normal operating range (Operation range) P Creg 060-2019: Artí culo 11&14 Test Conditions Measurements Limitation U/Un f [Hz] cosφ t [s] 100% 58.5 1.00 30 min No disconnection No disconnection 100% 62.0 1.00 30 min No disconnection No disconnection 100% 57.5 1.00 15s No disconnection No disconnection
100% 58.5 1.00 30 min No disconnection No disconnection 100% 62.0 1.00 30 min No disconnection No disconnection 100% 57.5 1.00 15s No disconnection No disconnection 100% 63.0 1.00 15s No disconnection No disconnection 85% 60.0 1.00 30 min No disconnection No disconnection 110% 60.0 1.00 30 min No disconnection No disconnection Note(s): Function of interface protection and activating active power response to over/under frequency and voltage shall be disable.
Graphs: Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1
Seite 4 von 200 Page 4 of 200
Test plan for Columbia 2 TABLE: Immunity to disturbances - Rate of change of frequency (ROCOF) P Anexo 1 Acuerdo 1749: 6.1 Test Condition Measurement Limit f [Hz] Time [s] 60 3 Connect Connect 61 3 Connect Connect 59 3 Connect Connect 60 6 Connect Connect Note(s):At least 2 Hz/sTest Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 5 von 200 Page 5 of 200
Test plan for Columbia 3.1 TABLE: Frequency Sensitive Mode (FSM-O) P Creg 060-2019: Artí culo 12 Test Conditions Measurements Limitation f [Hz] P/Pn f [Hz] Trise [s] Te [s] Tr [s] Droop Droop Te [s] Tr [s] a) 60 99.96% 60.00 -- -- -- --
f [Hz] P/Pn f [Hz] Trise [s] Te [s] Tr [s] Droop Droop Te [s] Tr [s] a) 60 99.96% 60.00 -- -- -- -- 2%≤Droop≤6% ≤15 ≤2 b) 60.1 95.96% 60.10 -- 2.2 0.3 4.08% c) 60.2 91.90% 60.20 -- 1.8 0.1 4.11% Note(s): P(f) curve setting for test: ∆P1=10%Pn, Droop: 4%Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 6 von 200 Page 6 of 200
Test plan for Columbia 3.2 TABLE: Frequency Sensitive Mode (FSM-U) P Test Conditions Measurements Limitation f [Hz] P/Pn f [Hz] Trise [s] Te [s] Tr [s] Droop Droop Te [s] Tr [s] a) 60 10.01% 60.00 -- -- -- -- 2%≤Droop≤6% ≤15 ≤2 b) 59.9 14.03% 59.90 -- 2.5 0.2 4.14% c) 59.8 18.04% 59.80 -- 2.3 0.2 4.09% Note(s): P(f) curve setting for test: ∆P1=10%Pn, Droop: 4%Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 7 von 200 Page 7 of 200
Test plan for Columbia
Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 7 von 200 Page 7 of 200
Test plan for Columbia 4.1 Over-frequency active power control on the grid connection port P Creg 060-2019: Artí culo 13 Step # Set output power [%] frequency [Hz] Target value P/Pn Actual power values P/Pn Deviatio n ∆ P/Pn [%] Tr [s] Te [s] Limitation Power toleran ce Power unblan ce Tr[s] Te[s] 1 100 60.00 100% 99.97% -0.03% -- -- ± 2.5% Pn <5%P n <2(initi al time in 1st step exclud ed) <15 2 100 60.25 98.8% 98.77% -0.03% 0.2 2.4 3 100 61.00 89.8% 89.77% -0.03% 0.2 3.0 4 100 61.80 80% 79.97% -0.03% 0.3 3.2 5 100 63.00 65.8% 65.78% -0.02% 0.1 2.8 6 100 61.80 80% 79.97% -0.03% 0.1 2.6 7 100 61.00 89.8% 89.77% -0.03% 0.2 2.7 8 100 60.25 98.8% 98.77% -0.03% 0.3 2.4
7 100 61.00 89.8% 89.77% -0.03% 0.2 2.7 8 100 60.25 98.8% 98.77% -0.03% 0.3 2.4 8 100 60.00 100% 99.97% -0.03% 0.2 1.8
Note:
60.15Hz: 100%PM
12%Pn/HzTest Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 8 von 200 Page 8 of 200
Test plan for Columbia 4.2 Under-frequency active power control on the grid connection port P Step # Set output power [%] frequency [Hz] Target value P/Pn Actual power values P/Pn Deviation ∆ P/Pn [%] Tr [s] Te [s] Limitation Power tolerance Powe r unbla nce Tr[s] Te[s] 1 100 60.00 25% 24.99% -0.01% -- -- ± 2.5% Pn <5%P n <2(initial time in 1st step exclude d) <15 2 100 59.75 26.2% 26.19% -0.01% 0.1 2.4 3 100 59.00 35.2% 35.19% -0.01% 0.2 2.6 4 100 58.00 47.2% 47.18% -0.02% 0.2 2.4 5 100 57.50 53.2% 53.18% -0.02% 0.2 3.0
4 100 58.00 47.2% 47.18% -0.02% 0.2 2.4 5 100 57.50 53.2% 53.18% -0.02% 0.2 3.0 6 100 58.00 47.2% 47.19% -0.01% 0.4 3.4 7 100 59.00 35.2% 35.19% -0.01% 0.2 2.8 8 100 59.75 26.2% 26.19% -0.01% 0.4 3.5 8 100 60.00 25% 24.99% -0.01% 0.2 2.6
Note:
59.85Hz: 25%PM
12%Pn/HzTest Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 9 von 200 Page 9 of 200
Test plan for Columbia 5 Active power reduction through setting provision (P control) P Test procedure for accuracy Test Conditions Measurements Limit P/Pn [%] P [W] ∆P/Pn [%] ∆ P/Pn [%] 100 1099591.33 -0.04% ≤ 5% 90 989733.77 -0.02% 80 879755.26 -0.02% 70 769776.15 -0.02% 60 659826.60 -0.02% 50 549766.14 -0.02% 40 439916.22 -0.01% 30 329902.18 -0.01% 20 219896.48 -0.01% 10 110008.45 0.00% No disconnection occurs Y/N Note(s):Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1
20 219896.48 -0.01% 10 110008.45 0.00% No disconnection occurs Y/N Note(s):Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 10 von 200 Page 10 of 200
Test plan for Columbia 6 P&Q range P Creg 060-2019: Artí culo 14
Test condition: Qcmax: at PF=- (cap.); QLmax: At PF= (induc.); Q0: at PF=1
Power-Bin Active power [W] Reactive Power [VAr] Reactive Power/ Pmax Power Factor (cosφ) Target Reactive Power/ Pn Deviation Limits(Q) 10 % no. 1 109943.04 110052.06 10.00% 0.707 10.% 0.00% -- no. 2 109935.31 -110044.27 -10.00% 0.707 -10.% 0.00% -- no. 3 109972.54 2893.80 0.26% 1.000 0% 0.26% -- 20 % no. 1 219721.91 759064.22 69.01% 0.278 69% 0.01% +/-2,5%Pn no. 2 219726.98 -759097.01 -69.01% 0.278 -69% -0.01% +/-2,5%Pn no. 3 219913.06 5764.78 0.52% 1.000 0% 0.52% +/-2,5%Pn 30 % no. 1 329709.08 759115.50 69.01% 0.398 69% 0.01% +/-2,5%Pn
30 % no. 1 329709.08 759115.50 69.01% 0.398 69% 0.01% +/-2,5%Pn no. 2 329709.75 -759128.89 -69.01% 0.398 -69% -0.01% +/-2,5%Pn no. 3 329898.10 8674.48 0.79% 1.000 0% 0.79% +/-2,5%PnTest Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 11 von 200 Page 11 of 200
Test plan for Columbia 50 % no. 1 549671.70 759234.51 69.02% 0.586 69% 0.02% +/-2,5%Pn no. 2 549683.73 -759255.68 -69.02% 0.586 -69% -0.02% +/-2,5%Pn no. 3 549810.70 14395.17 1.31% 1.000 0% 1.31% +/-2,5%Pn 95 % no. 1 1011569.80 759606.10 69.06% 0.800 69% 0.06% +/-2,5%Pn no. 2 1011545.16 -759578.14 -69.05% 0.800 -69% -0.05% +/-2,5%Pn no. 3 1044615.56 27296.01 2.48% 1.000 0% 2.48% +/-2,5%Pn 100 % no. 1 1011561.03 759595.61 69.05% 0.800 69% 0.05% +/-2,5%Pn
100 % no. 1 1011561.03 759595.61 69.05% 0.800 69% 0.05% +/-2,5%Pn no. 2 1011547.49 -759579.49 -69.05% 0.800 -69% -0.05% +/-2,5%Pn no. 3 1099604.75 26899.63 2.45% 1.000 0% 2.45% +/-2,5%PnTest Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 12 von 200 Page 12 of 200
Test plan for Columbia 7 TABLE: Undervoltage and overvoltage trip settings test P Anexo 1 Acuerdo 1749: 7.6 For system installed or rated capacity > 0.25 MW Condition Setting Measurement Limitation Trip value [U/Un]
L1L2 L2L3 L3-L1 L123
U> 1.15Un 1.15 1.15 1.15 1.16 ± 0.01Un Setting [ms] Measurement Limitation [ms] Trip time [ms] L1L2 L2L3 L3-L1 L123 2500 2498.14 2499.34 2484.25 2498.88 ≤2500 Reconnection Delay time [s] Power Gradient [%Pn/min] Limitation 510.8 11.05 ≥ 500 ≤14 Condition Setting [V] Measurement Limitation Trip value [U/Un]
L1L2 L2L3 L3-L1 L123
U>> 1.25Un 1.25 1.25 1.25 1.25 ± 0.01Un Setting [ms] Measurement Limitation [ms]
Trip time [ms]
U>> 1.25Un 1.25 1.25 1.25 1.25 ± 0.01Un Setting [ms] Measurement Limitation [ms]
Trip time [ms] L1L2 L2L3 L3-L1 L123 500 498.54 499.14 490.58 497.12 ≤500 Reconnection Delay time [s] Power Gradient [%Pn/min] Limitation 11.10 ≥ 500 ≤14 Condition Setting [V] Measurement Limitation [V] Trip value [U/Un]
L1L2 L2L3 L3-L1 L123
U< 0.80Un 0.80 0.79 0.80 0.80 ± 0.01Un Reconnection Delay time [s] Power Gradient [%Pn/min] Limitation 504.8 11.12 ≥ 500 ≤14 Condition Setting [V] Measurement Limitation [V] Trip value [V]
L1L2 L2L3 L3-L1 L123
U<< 0.60Un 0.59 0.59 0.60 0.60 ± 0.01Un Reconnection Delay time [s] Power Gradient [%Pn/min] Limitation 507.1 11.07 ≥ 500 ≤14 Note(s):Test Plan Prü fbericht-Nr.: Test report no.: CN24LC9U 001 Attachment 1 Seite 13 von 200 Page 13 of 200
Test plan for Columbia 8 TABLE: Underfrequency and overfrequency trip settings test P Anexo 1 Acuerdo 1749: 7.6 Condition Setting Australia A [Hz] Measurement Limitation [Hz] Trip value [Hz] 63.0 L1 L2 L3 F> 63.00 63.00 63.00 ± 0.01
Condition Setting Australia A [Hz] Measurement Limitation [Hz] Trip value [Hz] 63.0 L1 L2