CNO - CO201 LaLoma PPC parameters de 2024
CNO - Consejo Nacional de Operación
Descargar PDF
Disponible
Detalles
- Título
- CNO - CO201 LaLoma PPC parameters de 2024
- Autor
- CNO - Consejo Nacional de Operación
- Categoría
- Infralegal
- Área del derecho
- Servicios Públicos
- Año
- 2024
Enertronica Santerno S.p.A. 7, Via della Concia - 40023 Castel Guelfo (BO) Italy | Ph. +39 0542 489711 Share Capital €785,560.60 fully paid-up | Tax Id. no. and VAT no. 05151831210 | BO Reg. no. 536234
PEC: enertronica@pec.it | info@santerno.com | www.enertronicasanterno.it
Project CO201 – EGP – La Loma (Colombia)
Enertronica Santerno certifies that the following parameters configured in the Power Plant Controller (PPC) have been implemented and tested in the renewable solar plant in La Loma, Colombia: Active Power Ramp Range Minimum 12000 kW/min Maximum 30000 kW/min Current setting 21000 kW/min
Primary Frequency Statism Range Minimum 2 % Maximum 6 % Current setting 4 %
Frequency Dead-band Range Minimum 0 mHz Maximum 120 mHz Current setting 30 mHz
Primary Voltage Statism Range Minimum 1 % Maximum 30 % Current setting 8 %
Castel Guelfo Technical Director April 11, 2024 Giampaolo Sgubbi