2026_230515-TTA CREG (1)
Consejo Nacional de Operaciones
Descargar PDF
Disponible
Detalles
- Título
- 2026_230515-TTA CREG (1)
- Autor
- Consejo Nacional de Operaciones
- Categoría
- Infralegal
- Área del derecho
- Servicios_Publicos
- Año
- 2026
Page. 1 of 4. This document cannot be reproduced partially Nº 230515-TTA Certification Entity for Renewable Energies, S.L. c/Monturiol, 15, 28906 Getafe, Madrid, Spain. Phone: + 34 34 91 061 26 14
TYPE TEST APPROVAL
No:230515-TTA
Licence Holder/ Applicant Huawei Technologies Colombia S.A.S. Cra 68ª No. 24B-10. Plaza Claro, Tower 2, 10th floor. Bogotá, Colombia. Product
Inversor Solar Trifásico Trademark/ Series/ Model
Tested model: - Huawei / SUN2000 / SUN2000-185KTL-H1
Variant models (): - Huawei / SUN2000 / SUN2000-105KTL-H1 - Huawei / SUN2000 / SUN2000-215KTL-H0 - Huawei / SUN2000 / SUN2000-215KTL-H3 - Huawei / SUN2000 / SUN2000-330KTL-H1
Serial Number
6T1979046065 Y Firmware Version
Tested firmware version:
- V300R001
Variant firmware version (): - V100R023 (for Huawei SUN2000-330KTL-H1 model)
Standard Comisión de Regulación de Energía y Gas: Resolución No. 060 de 2019. Por la cual se hacen modificaciones y adiciones transitorias al Reglamento de Operación para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SIN y se dictan otras disposiciones. Article 14. Clause 5.7 c) and d).
Comisión de Regulación de Energía y Gas: Resolución No. 148 de 2021. Por la cual se adiciona un Capítulo Transitorio al Anexo
disposiciones. Article 14. Clause 5.7 c) and d).
Comisión de Regulación de Energía y Gas: Resolución No. 148 de 2021. Por la cual se adiciona un Capítulo Transitorio al Anexo General del Reglamento de Distribución contenido en la Resolución CREG 070 de 1998, para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SDL con capacidad efectiva neta o potencia máxima declarada igual o mayor a 5 MW y se dictan otras disposiciones. Clause: 11.2.4.
Comisión de Regulación de Energía y Gas No. 101 011 de 2022. Por la cual se adiciona un Capítulo Transitorio al Anexo General del Reglamento de Distribución contenido en la Resolución CREG 070 de 1998, para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SDL con capacidad efectiva neta o potencia máxima declarada igual o mayor a 1 MW y menor a 5 MW, y se dictan otras disposiciones. Clause: 12.2.3.Page. 2 of 4. This document cannot be reproduced partially Nº 230515-TTA
Certification Entity for Renewable Energies, S.L. c/Monturiol, 15, 28906 Getafe, Madrid, Spain Phone: + 34 91 061 26 14
The above-mentioned generating unit complies the requirements of “Comisión de Regulación de Energía y Gas: Resolución No. 060 de 2019. Por la cual se hacen modificaciones y adiciones transitorias al Reglamento de Operación para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SIN y se dic tan otras disposiciones. Article 14. Clause 5.7 c) and d) ,
transitorias al Reglamento de Operación para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SIN y se dic tan otras disposiciones. Article 14. Clause 5.7 c) and d) , Comisión de Regulación de Energía y Gas: Resolución No. 148 de 2021. Por la cual se adiciona un Capítulo Transitorio al Anexo General del Reglamento de Distribución contenido en la Resolución CREG 070 de 1998, para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SDL con capacidad efectiva neta o potencia máxima declarada igual o mayor a 5 MW y se dictan otras disposiciones. Clause: 11.2.4. and Comisión de Regulación de Energía y Gas No. 101 011 de 2022. Por la cual se adiciona un Capítulo Transitorio al Anexo General del Reglamento de Distribución contenido en la Resolución CREG 070 de 1998, para permitir la conexión y operación de plantas solares fotovoltaicas y eólicas en el SDL con capacidad efectiva neta o potencia máxima declarada igual o mayor a 1 MW y menor a 5 MW, y se dictan otras disposiciones. Clause: 12.2.3”
Having assessed the test results in the test report Nº 20994-1-TR and Nº 20994-2-TR performed by CERE, issued on 23/03/2022. () CERE as a testing laboratory has not evaluated and is not responsible of the variant models and variant firmware version above mentioned. They have been indicated by the manufacturer.
This TTA cancels and supersedes the TTAs number: 20994-1-TTA and 20994 -2-TTA-E1 issued on 23/03/2022 and 01/09/2022.
Place, Date: Madrid, 11/07/2023
23/03/2022 and 01/09/2022.
Place, Date: Madrid, 11/07/2023
Alberto Martín (Technical Director)Page. 3 of 4. This document cannot be reproduced partially Nº 230515-TTA
Certification Entity for Renewable Energies, S.L. c/Monturiol, 15, 28906 Getafe, Madrid, Spain Phone: + 34 91 061 26 14
Technical data
185KTLH1
105KTLH1
215KTLH0
215KTLH3
330KTLH1
DC input Máx. Tensión (V) 1500 Máx. Corriente por MPPT (A) 26 25 30 100 65 Máx. Corriente de Cortocircuito por MPPT (A) 40 33 50 - 115 Rango de Tensión MPPT (V) 500-1500 600-1500 500-1500 500-1500 500-1500 Tensión de Entrada Nominal (V) 1080 Número de Entradas 18 12 18 14 28 Número de Seguidores MPPT 9 6 9 3 6 AC output Potencia Activa Nominal (kW) 175 105 200 200 300 Máx. Potencia Aparente (kVA) 185 116 215 215 330 Máx. Potencia Activa (kW) 185 116 215 215 330 Tensión Nominal (V) 800 Frecuencia de Red Nominal (Hz) 50 / 60 Corriente Nominal (Arms) 126,3 75,8 144,4 144,4 216,6
Tensión Nominal (V) 800 Frecuencia de Red Nominal (Hz) 50 / 60 Corriente Nominal (Arms) 126,3 75,8 144,4 144,4 216,6 Rango de Ajuste de Factor de Potencia 0,8 LG…0,8 LD Máx. THD < 3% < 3% < 3% < 1% <1% Rango de Ajuste del Factor k en FRT 0 ≤ k ≤ 10Page. 4 of 4. This document cannot be reproduced partially Nº 230515-TTA
Certification Entity for Renewable Energies, S.L. c/Monturiol, 15, 28906 Getafe, Madrid, Spain Phone: + 34 91 061 26 14
Verification of the test report
Verification Notes Results Priorización de la inyección de corriente reactiva de forma que alcanza un 90% del delta de cambio esperado en menos de 50 ms, con una tolerancia del 20%, ante desviaciones de tensión que excedan los límites operativos de la tensión nominal en la planta de generación. Los 50 ms consideran el tiempo necesario para detectar la falla.
See the following test reports : 20994-1-TR & 20994-2-TR Pass Limitación del aporte de potencia reactiva adicional al 100% de la corriente nominal de cada generador See the following test reports: 20994-1-TR & 20994-2-TR Pass Sostenimiento del aporte de potencia reactiva adicional siempre que la tensión esté por fuera del rango normal de operación.
See the following test reports: 20994-1-TR & 20994-2-TR Pass Sostenimiento de la potencia reactiva durante 500 ms
siempre que la tensión esté por fuera del rango normal de operación.
See the following test reports: 20994-1-TR & 20994-2-TR Pass Sostenimiento de la potencia reactiva durante 500 ms después de la tensión entre a la banda muerta de tensión manteniendo un aporte adicional proporcional a la desviación de la tensión con respecto al valor de referencia (1 p.u).
See the following test reports: 20994-1-TR & 20994-2-TR Pass Si la ganancia k es configurable en cada inversor y en qué rango. Debe demostrarse que al menos es configurable entre 0 y 10.
See manufacturer declaration. Datasheet above (configurable between 0 - 10) Pass El ajuste de la banda muerta. See the following test reports : 20994-1-TR & 20994-2-TR Pass
RECORD OF CHANGES Version Reason of the modifications Modifications Date 0 Initial Version - 11/07/2023